Critical
107 shifts old
IN PROGRESS

AG-07 rebuild in progress

Gearbox pulled successfully. New gears being fitted. Crane on-site until Wednesday. Area barricaded — do not remove barriers.

Christine Baker1:14 AM
0/28 ack
Critical
107 shifts old
IN PROGRESS

AG-07 rebuild in progress

Gearbox pulled successfully. New gears being fitted. Crane on-site until Wednesday. Area barricaded — do not remove barriers.

Christine Baker1:09 AM
0/28 ack
High
129 shifts old
IN PROGRESS

Fermentation batch F-2024-089 pH drift

Batch F-2024-089 in reactor R-203 showing gradual pH drift from 5.2 to 5.8 over last 4 hours. Added 2L of phosphoric acid buffer at 16:00 - pH returned to 5.3. QC has pulled a sample for analysis. Next pH check in 2 hours. If pH exceeds 6.0, contact process engineer on call immediately.

Francisco Allen5:31 PM
0/28 ack
Low
107 shifts old
OPEN

Steam header insulation status

Contractor completed 60% of pipe insulation work. Remaining sections require scaffolding. Scaffold going up Wednesday.

Christine Baker1:14 AM
0/28 ack
Low
107 shifts old
OPEN

Steam header insulation status

Contractor completed 60% of pipe insulation work. Remaining sections require scaffolding. Scaffold going up Wednesday.

Christine Baker1:09 AM
0/28 ack
Low
RESOLVED

Shift handover: reactor temp stable at 185F

Reactor R-201 fermentation batch F-2024-088 running normally. Temperature stable at 185F for last 6 hours. Agitator running at 60 RPM. Dissolved oxygen at 4.2 ppm. Next sampling due at 0200. All other reactors are in CIP or standby mode. Nothing unusual to report for incoming shift.

Francisco Allen5:31 PM
15/28 ack