SkyCal
Monday, March 9, 202607:51:19 PM

Maintenance & Engineering

Safety Board

Active Incidents (1)

First Aid
INVESTIGATING

Electrical arc flash near MCC panel 4B during breaker racking operation. Maintenance electrician experienced brief arc flash while racking in a 480V breaker. Flash burned arm hair through Nomex sleeve but no skin contact burn. PPE prevented injury.

Wed, Mar 4, 10:18 PM
Location: Electrical Room 2 - MCC Panel 4B
Reported by: Sofia Long
9/32 acknowledged (28%)
Acknowledge